(function(d) { var config = { kitId: 'cxx4gsr', scriptTimeout: 3000, async: true }, h=d.documentElement,t=setTimeout(function(){h.className=h.className.replace(/\bwf-loading\b/g,"")+" wf-inactive";},config.scriptTimeout),tk=d.createElement("script"),f=false,s=d.getElementsByTagName("script")[0],a;h.className+=" wf-loading";tk.src='https://use.typekit.net/'+config.kitId+'.js';tk.async=true;tk.onload=tk.onreadystatechange=function(){a=this.readyState;if(f||a&&a!="complete"&&a!="loaded")return;f=true;clearTimeout(t);try{Typekit.load(config)}catch(e){}};s.parentNode.insertBefore(tk,s) })(document);

Paving Work Begins for 2021

There’s nothing better than driving on new pavement, right?

Industries along South Industrial Drive saw new pavement installed yesterday. The new paving is part of the City of Morgantown’s 10 year street improvement plan which will repave all city streets in that 10 year period. Currently on year 4, the City is ahead of schedule. This year, the City will repave and reconstruct 22 City streets, these streets were graded by the City’s engineer who considers the condition of the roadway in addition to the amount of traffic. The contract was awarded to Scotty’s Contracting of Bowling Green, KY who will complete the work before December of this year. Work was off to a quick start with South Industrial Drive (pictured) being completed on July 20th. The contractors will return next week to continue the work.